The picture shows a simplified utility solar farm that consists of a single grid-tied solar PV (photovoltaic) inverter connected to a transformer that is connected to the national electric grid. Gas oil ratio formula Each solar inverter is connected to thousands of solar PV panels.

According to recent media reports, some progress has been made on the long-awaited Gwanda solar project as evidenced by the deal that was signed by Intratrek Zimbabwe, Chint Power Systems and Zimbabwe Power Company (Sibanda 2015). Gas station car wash Adding another 100 MW to the grid sounds great in theory until you look in the details and the controversy surrounding the project (Share 2016). Basic electricity quizlet The success of the project depends on the diligence and technical ability of stakeholders during the design, construction and operation phases. Arkansas gas association Solar engineers must consider factors such as the impact of load-shedding, intermittency of solar energy, cost, existing electrical noise on the grid, local climate, state of existing electric grid transmission and distribution infrastructure, risk of vandalism, risk of theft, long-term plant operation and maintenance strategy and bankability of the main contractor. Electricity notes for class 10 I shall restrict my attention to the technical details of two factors: load-shedding and intermittency of solar energy. Gas x side effects Load-shedding

Load-shedding is the intentional shutdown of some areas of the national electric grid when there is a power shortage. Electricity out in one room As counter-intuitive as it may sound, load-shedding may limit the performance of the proposed Gwanda solar project. Electricity word search answer key The reasons are found in the technical requirements of large utility solar farms, also known as solar photovoltaic (PV) grid-connected power plants. M power electricity Utility solar farms, like the proposed Gwanda solar project, convert sun’s energy into electricity (direct current) using thousands of solar PV panels; change the electricity into a grid-friendly form (alternating current) using hundreds of special solar inverters also known as grid-tied solar PV inverters; and then transmit the electricity to the national electric grid to meet demand. Electricity formulas physics The proposed Gwanda solar power plant must be connected to the grid because consumers are on the grid and it is expensive to store such large amount of electricity in batteries.

Technical challenges arise when the grid, which the solar PV power plant is connected to, is turned OFF during load-shedding. Electricity experiments elementary school Most grid-tied solar inverters such as those likely to be used in the Gwanda solar project (Chint Power Systems’ CPS SCA500/630kW) are required to shut down when the grid shuts down (anti-islanding feature) as per IEEE 1547, IEC 62109 or IEC 61727 standards. Electricity journal Why shut down the solar inverters when the power is most needed? Well, two reasons: (1) to protect utility workers who may be doing repair work on the same electric grid as the inverters and (2) to prevent the solar grid-tied inverters from going out of sync with the electric grid’s voltage and frequency. Gas symptoms The first of the aforementioned reasons comes natural to most people who have changed a light bulb or installed a new electrical socket in a house—always turn the main switch OFF before any repair work! If the grid is shut down, the solar inverter is shutdown as well and so there is no power to transmit to the national grid.

In the context of the current load-shedding schedule of 4AM to 10PM, the proposed Gwanda solar power plant will not be transmitting power to the grid from 4AM to 10PM (Mawonde 2015). Gas news of manipur Therefore, the proposed Gwanda solar power plant may not serve its purpose unless drastic measures are put in place to mitigate effects of load-shedding.

From my experience and training in the solar PV industry, I am not aware of plans to bypass anti-islanding features in order to address load-shedding schedules that last several hours as experienced in Zimbabwe. Gas upper back pain However, solutions exist for temporary grid shutdowns and instabilities that last only a few seconds; solar grid-tied inverters are equipped with low-voltage ride through (LVRT), zero-voltage ride through (ZVRT) and/or frequency ride through (FRT) technologies to prevent the solar power plant from shutting down due to minor disturbances on the grid (Bank, et al. Gas chamber jokes 2013). Gas oil ratio calculator Chint Power Systems’ CPS SCA500/630kW inverter has the zero-voltage ride through capability meaning that it can continue to operate when the grid voltage is low for a few seconds.

The best solution is to connect the solar power plant to a transmission line that is ON and has stable voltage and frequency all the time. Gas near me cheap How many transmission lines meet this criterion in the Gwanda area? Whatever the answer may be, solar engineers should be prepared to deal with occasional disturbances even in the most stable grid. Gas x while pregnant Intermittency of solar energy

The saying “as unpredictable as the weather” is true with electricity from ordinary solar PV power plants. 5 gas laws If thick clouds form, then immediately the solar power plant produces very little or no electricity and thousands of households are left in the dark. Electricity 101 youtube The same scenario occurs when a layer of dust settles on the sunny side of solar panels. Electricity trading What about at night? The public cannot surely depend on solar energy at night unless the solar power plant is equipped with expensive back-up batteries.

The challenge is magnified if the solar power plant supports a big portion of the total power production on a given section of the electric grid. Gas prices in michigan As an analogy, a person who earns $200 is more devastated than a person who earns $3000 if they both lose $100 to a thief. Eseva electricity bill payment In the same way, on cloudy and dusty days or at night, loss of solar power may lead to unexpected and devastating power shortages to the users of the Gwanda solar power plant.

In response to sudden loss of solar power, the grid operator (Zimbabwe Power Company in this case) turns ON big diesel generators (or any other form of peaking generators) to make-up for the ‘lost’ solar PV electricity and in order to keep consumers satisfied. Electricity definition wikipedia The success of this solution depends on the availability of diesel generators of sufficient capacity, fast communication technology, and reliable weather prediction tools. Gas efficient suv 2008 In summary, advanced and often expensive technology, much of it is already in use in modern electric grids, is needed to deal with the intermittence of solar energy.

In conclusion, the success of the proposed Gwanda solar project depends on how much stakeholders mitigate the effects of load-shedding, intermittence of solar energy and a host of other technical, legal and political factors. 8 gas laws Fortunately, we, as a country, can avoid common pitfalls by learning practical lessons on the integration of renewable energy from places that have high percentage of renewable energy power plants such as Hawaii, Arizona, California, Denmark and Germany (Bank, et al. La gastronomia 2013) (Hawaii Electric Companies 2014) (Public Utilities Commision: State of Hawaii 2013). Gas yoga References

• Bank, J, B Mather, J Keller, and M Coddington. Electricity lab physics High Penetration Photovoltaic Case Study Report. Victaulic t gasket Technical, U.S. Wb state electricity board bill pay Department of Energy, NREL, Golden, CO: NREL, 2013, 15-19.

• Hawaii Electric Companies. Gas bubbler Transient Over-Voltage Mitigation: Explanation and Mitigation Options for Inverter-Based Distributed Generation Projects ≤ 10kW. Gas vs diesel prices February 24, 2014. Gas bloating frequent urination https://www.hawaiianelectric.com/vcmcontent/StaticFiles/pdf/TOV-Mitigation-Measures-Public-Brief-Feb-24-2014(Final).pdf (accessed October 6, 2014).

This guest article was written by Jonah Kadoko. Electricity notes He is a mechanical engineer with a strong passion for power generation systems. Electricity jeopardy 4th grade Currently, he is pursuing graduate studies in mechanical engineering at Tufts University. Bp gas prices He has experience in the design of commercial scale solar PV grid-tied inverters and solar power plants from his training in solar engineering and previous role as a mechanical design engineer at Solectria Renewables, MA USA.