2.look for a land speculator or agent, that will help you in getting the land that can soothes your purpose. make sure you see the land and get all necessary original document related to land before payment. you can arrange with a lawyer to help you in preparing and checking the documents to make sure you are not buying a land from the wrong person,and to avoid land with dispute.

3. You need meet with your local town planning authority in your area to make sure that land is meant for the purpose you have in mind and they can give first hand information about development pattern in that area.Land under Government acquisition will be found through this process.

11. Setting out time, in some case bricklayers uses blocks to set out a foundation most especially when it is a small building and the ground is level, The Builder can collaborate with bricklayer to do this in a some complex plan. They will have to buy woods, ropes, nails and you have to pay for the services or based on contract or as agreed.

13. Block laying begins. Blocks are laid by the bricklayers on the concrete to about three or more courses (Coaches) as required, this serving as the d.p.c level. It is then filled with red sand and rammed (compacted or made hard). an over-site concrete or (German floor) is poured round to cover the d.p.c (in waterlogged, sloppy or sandy area you may need to apply reinforcements or Iron at the edges of building and nylon-like membrane is used to cover some site especially when there is a threat of water problems).

14. At this stage blocks are laid to window base, four courses(coaches) or layers after marking out the doors, then after the four coaches(courses) you mark out the windows and go another five coaches(courses), the entire opening in the house is now ready for concrete lintel.

15. At this stage Iron benders or welders are involved, they will have to make their estimate the carpenter and the bricklayers are all going to work here the welder is responsible for cutting and bringing in the Iron, the carpenter makes the frame or form work to contain the concrete.The bricklayer with laborers pours(casts) into the boxes(form work) which are properly filled with concrete.

18. The electrification and plumbering works can begin. You can now contact your electrician and plumber. you can ceiling simultaneously or after electrification. Your soak-away pig can now be Dug and connection of pipe services will be handled by the plumber,

2.look for a land speculator or agent, that will help you in getting the land that can soothes your purpose. make sure you see the land and get all necessary original document related to land before payment. you can arrange with a lawyer to help you in preparing and checking the documents to make sure you are not buying a land from the wrong person,and to avoid land with dispute.

3. You need meet with your local town planning authority in your area to make sure that land is meant for the purpose you have in mind and they can give first hand information about development pattern in that area.Land under Government acquisition will be found through this process.

11. Setting out time, in some case bricklayers uses blocks to set out a foundation most especially when it is a small building and the ground is level, The Builder can collaborate with bricklayer to do this in a some complex plan. They will have to buy woods, ropes, nails and you have to pay for the services or based on contract or as agreed.

13. Block laying begins. Blocks are laid by the bricklayers on the concrete to about three or more courses (Coaches) as required, this serving as the d.p.c level. It is then filled with red sand and rammed (compacted or made hard). an over-site concrete or (German floor) is poured round to cover the d.p.c (in waterlogged, sloppy or sandy area you may need to apply reinforcements or Iron at the edges of building and nylon-like membrane is used to cover some site especially when there is a threat of water problems).

14. At this stage blocks are laid to window base, four courses(coaches) or layers after marking out the doors, then after the four coaches(courses) you mark out the windows and go another five coaches(courses), the entire opening in the house is now ready for concrete lintel.

15. At this stage Iron benders or welders are involved, they will have to make their estimate the carpenter and the bricklayers are all going to work here the welder is responsible for cutting and bringing in the Iron, the carpenter makes the frame or form work to contain the concrete.The bricklayer with laborers pours(casts) into the boxes(form work) which are properly filled with concrete.

18. The electrification and plumbering works can begin. You can now contact your electrician and plumber. you can ceiling simultaneously or after electrification. Your soak-away pig can now be Dug and connection of pipe services will be handled by the plumber,

2.look for a land speculator or agent, that will help you in getting the land that can soothes your purpose. make sure you see the land and get all necessary original document related to land before payment. you can arrange with a lawyer to help you in preparing and checking the documents to make sure you are not buying a land from the wrong person,and to avoid land with dispute.

3. You need meet with your local town planning authority in your area to make sure that land is meant for the purpose you have in mind and they can give first hand information about development pattern in that area.Land under Government acquisition will be found through this process.

11. Setting out time, in some case bricklayers uses blocks to set out a foundation most especially when it is a small building and the ground is level, The Builder can collaborate with bricklayer to do this in a some complex plan. They will have to buy woods, ropes, nails and you have to pay for the services or based on contract or as agreed.

13. Block laying begins. Blocks are laid by the bricklayers on the concrete to about three or more courses (Coaches) as required, this serving as the d.p.c level. It is then filled with red sand and rammed (compacted or made hard). an over-site concrete or (German floor) is poured round to cover the d.p.c (in waterlogged, sloppy or sandy area you may need to apply reinforcements or Iron at the edges of building and nylon-like membrane is used to cover some site especially when there is a threat of water problems).

14. At this stage blocks are laid to window base, four courses(coaches) or layers after marking out the doors, then after the four coaches(courses) you mark out the windows and go another five coaches(courses), the entire opening in the house is now ready for concrete lintel.

15. At this stage Iron benders or welders are involved, they will have to make their estimate the carpenter and the bricklayers are all going to work here the welder is responsible for cutting and bringing in the Iron, the carpenter makes the frame or form work to contain the concrete.The bricklayer with laborers pours(casts) into the boxes(form work) which are properly filled with concrete.

18. The electrification and plumbering works can begin. You can now contact your electrician and plumber. you can ceiling simultaneously or after electrification. Your soak-away pig can now be Dug and connection of pipe services will be handled by the plumber,